90 Trinity Pl.
|
When 90 Trinity place was compromised during the events of 9/11/01 a full restoration project was required. Arsenal Scaffold designed an exterior scaffold system and roof top trolly crane to allow for complete removal of all granite and marble facade panels |
Terminal 1 - JFK Airport
|
As part of JFK Air Train Terminal
One project, one required an enormous Atrium Scaffold and
Rood Top Weather Enclosure. In order to expand the terminal
an additional floor while maintaning complete passenger
access Arsenal Scaffold designed a multiple tier access
solution. |